Eemil Lagerspetz #1. Mon 16th of May 2005 17.05.2005 MEET 1.0 Official meeting 17.05.2005 INST 3.0 Project homepage, latex-install, CVS-install 17.05.2005 INST 1.0 TortoiseCVS-tutorial, etc 18.05.2005 INST 2.0 CVS and binary files, rewriting the tutorial 19.05.2005 MEET 2.5 Official meeting 19.05.2005 INST 2.0 reorganizing CVS among other things 19.05.2005 PROJ 3.0 Writing about the risks 19.05.2005 INST 1.0 Learning about LaTeX 20.05.2005 MEET 2.5 Official meeting 20.05.2005 PROJ 1.0 Writing about communication and data storage # 1. week total: 19.0 19.0 #2. Mon 23rd of May 2005 23.05.2005 MEET 2.0 Official meeting 23.05.2005 PROJ 2.0 Writing parts of the planning document 24.05.2005 MEET 2.0 Official meeting 24.05.2005 PROJ 3.0 Discussing risks with the project manager 25.05.2005 MEET 2.0 Official meeting 25.05.2005 PROJ 1.0 Tweaking the risks 25.05.2005 PROJ 2.0 Adding more content to the risks 25.05.2005 INST 2.0 Configuring a backup CVS server for emergencies 27.05.2005 PROJ 1.0 Reading up for the review of the project plan 27.05.2005 PROJ 1.0 Correcting some errors in the project plan 27.05.2005 PROJ 0.5 Fixing grammatical errors in the project plan # 2. week total: 18.5 37.5 #3. Mon 30th of May 2005 30.05.2005 MEET 2.0 Official meeting 30.05.2005 PROJ 2.0 Writing about testing 31.05.2005 REQU 2.0 Meeting to discuss requirements and use cases 31.05.2005 REQU 1.0 Writing the first draft of the use cases 31.05.2005 REQU 3.0 Discussing and writing the requirements 01.06.2005 MEET 2.0 Official meeting 01.06.2005 REQU 2.0 Working on the use cases and requirements 02.06.2005 MEET 2.0 Official meeting # 3. week total: 16.0 53.5 #4. Mon 6th of June 2005 06.06.2005 MEET 2.0 Official meeting 06.06.2005 REQU 1.0 Adding requirement Stabilities and Ids 07.06.2005 REQU 2.0 Meeting on the srs 07.06.2005 REQU 4.0 Copying and styling diagrams for the srs 08.06.2005 MEET 2.0 Official meeting 08.06.2005 REQU 4.0 Drawing system models, writing glossary 09.06.2005 REQU 2.0 Meeting on the requirements 10.06.2005 MEET 2.0 Official meeting 11.06.2005 REQU 2.0 Redrawing diagrams, writing model description # 4. week total: 21.0 74.5 #5. Mon 13th of June 2005 13.06.2005 MEET 2.0 Official meeting 13.06.2005 REQU 2.0 modifying diagrams, fixing some srs errors 14.06.2005 DESI 2.0 Calculation example meeting 14.06.2005 REQU 1.0 Reading up for the SRS inspection 15.06.2005 MEET 2.0 Official meeting 17.06.2005 REQU 3.0 SRS document inspection 17.06.2005 REQU 2.0 Correcting the SRS 17.06.2005 DESI 2.0 Writing the design document # 5. week total: 16.0 90.5 #6. Mon 20th of June 2005 20.06.2005 MEET 2.0 Official meeting 21.06.2005 DESI 5.5 Designing the prototype, etc. 22.06.2005 MEET 2.0 Official meeting 23.06.2005 DESI 4.0 Designing the prototype # 6. week total: 13.5 104 #7. Mon 27th of June 2005 27.06.2005 MEET 2.0 Official meeting 27.06.2005 DESI 1.0 Meeting up with the customer about blocking 27.06.2005 DESI 1.0 Structuring up and modifying the design doc 28.06.2005 DESI 4.0 Designing the prototype, writing the dd 28.06.2005 DESI 6.0 Making the prototype runnable 29.06.2005 MEET 2.0 Official meeting 29.06.2005 DESI 1.0 Redesigning the prototype internals 29.06.2005 DESI 1.5 Fixing prototype bugs 01.07.2005 MEET 2.0 Official meeting # 7. week total: 14.0 124.5 # --Vacation-- #8. Mon 18th of July 2005 18.07.2005 MEET 2.0 Official meeting 19.07.2005 DESI 2.0 Designing at the department 19.07.2005 DESI 1.0 Designing at home 20.07.2005 DESI 0.5 Meeting on the prototype with the customer 20.07.2005 DESI 1.0 Modifying the prototype for the new model 20.07.2005 DESI 2.5 Design meeting 20.07.2005 INST 1.0 Implementing \subsubsubsection 20.07.2005 DESI 1.0 Modifying the prototype 21.07.2005 DESI 3.0 Modifying the prototype 21.07.2005 DESI 0.5 Debugging the prototype 22.07.2005 MEET 2.0 Official meeting 22.07.2005 DESI 1.5 Debugging the prototype 22.07.2005 DESI 3.0 Writing the design document 23.07.2005 DESI 2.0 Writing the design document # 8. week total: 23.0 (147.5) / 8 = 18.44 #9. Mon 25th of July 2005 25.07.2005 MEET 1.0 Meeting with the project group 25.07.2005 DESI 2.0 Designing the parser 25.07.2005 DESI 3.0 Designing the parser(at home) 26.07.2005 TEST 0.5 Discussing testing 26.07.2005 DESI 1.0 Discussing design, writing the design document 26.07.2005 IMPL 1.0 Discussing implementation and writing the parser 26.07.2005 DESI 2.0 Reading the design document for the review 27.07 27.07.2005 DESI 1.0 The review 27.07.2005 DESI 2.0 Correcting the SDD, writing the parser 27.07.2005 DESI 2.0 Correcting the SDD, writing the parser(at home) 28.07.2005 IMPL 6.0 Writing the parser and other classes 29.07.2005 DESI 1.0 Putting up stuff into the Design document 29.07.2005 IMPL 2.0 Implementing the Parser 29.07.2005 IMPL 2.5 Implementing the Parser(at home) 30.07.2005 IMPL 4.0 Implementing the Parser(at home) 31.07.2005 DESI 1.0 Reading the SDD for the review on 03.08 # 9. week total: 32.0 (179.5) / 9 = 19.94 #10. Mon 1st of August 2005 01.08.2005 MEET 2.0 Meeting with the project group 01.08.2005 IMPL 2.0 Implementing the Parser(at home) 02.08.2005 IMPL 4.0 Implementing the Parser and fixing bugs 02.08.2005 IMPL 3.0 Implementing the Parser and fixing bugs 03.08.2005 MEET 0.5 Official review of the SDD & meeting 03.08.2005 IMPL 1.5 Fixing bugs and tweaking the parser 03.08.2005 IMPL 1.0 Fixing bugs and tweaking the parser(at home) 04.08.2005 IMPL 3.0 Finishing the Parser and tweaking the prototype 05.08.2005 MEET 1.5 Meeting with the project group 05.08.2005 IMPL 1.5 Adding features to the prototype 05.08.2005 IMPL 3.0 Adding features to the prototype and Parser # 10. week total: 23.0 (202.5) / 10 = 20.25 #11. Mon 8st of August 2005 08.08.2005 MEET 1.5 Meeting with the project group 08.08.2005 IMPL 1.5 Adding proposal strategy to the parser, repackaging 08.08.2005 IMPL 4.0 Fixing FortranWriter, implementing generateReadData 09.08.2005 MEET 1.0 Meeting with the customer about new example models 09.08.2005 IMPL 3.0 Writing Input.java 10.08.2005 OTHE 2.0 On Taina's testing lecture 10.08.2005 IMPL 4.0 Finishing Input, fixing FortranWriter indenting 11.08.2005 MEET 2.0 Meeting with the project group 11.08.2005 IMPL 3.0 Implementing the spatial part of Acceptation.java 12.08.2005 IMPL 2.0 Implementing generateSetFunctional # 11. week total: 24.0 (226.5) / 11 = 20.59 #12. Mon 15st of August 2005 15.08.2005 MEET 3.0 Official meeting 15.08.2005 TEST 5.0 Writing the Testing document 16.08.2005 TEST 2.5 Meeting & Writing tests for parseVariable 16.08.2005 TEST 5.0 Writing tests for parseVariable and the testing doc 17.08.2005 TEST 2.0 Writing the testing document and discussing features 17.08.2005 TEST 5.0 Ironing out bugs and bettering Output.java 18.08.2005 TEST 2.0 Official meeting & finding a bug 19.08.2005 TEST 2.0 Fixing the bug (functionals now update correctly) 19.08.2005 TEST 3.0 Testrunning on the cancer model, fixing misc. bugs 20.08.2005 OTPR 1.0 Javadocing the classes, writing the manual glossary # 12. week total: 30.5 (257.0) / 12 = 21.42 #13. Mon 22nd of August 2005 22.08.2005 TEST 2.0 Made the MasterTest class and ispelled the manual 23.08.2005 MEET 3.0 Meeting with the project group 23.08.2005 OTPR 4.0 Correcting the manual. 24.08.2005 MEET 3.0 Meeting with the project group and another with the customer 24.08.2005 TEST 2.0 Writing the testing document 24.08.2005 OTPR 3.0 Making a handy script for project release 25.08.2005 TEST 1.0 Incorporating tests into MasterTest 25.08.2005 OTPR 2.0 Writing the manual and modifying the Generator 25.08.2005 OTPR 4.0 Writing the manual and the cdrom script 26.08.2005 MEET 1.0 Meeting with the project group 26.08.2005 TEST 2.5 Testing the missing values handling in the generated simulation 26.08.2005 OTPR 1.0 put CD-ROM to the web page and other stuff 26.08.2005 OTPR 2.0 Checked the manual, testing doc, wrote some of the impl. doc 28.08.2005 TEST 4.0 Fixed some latent bugs and refactored stuff. The bird model doesn't work yet. # 13. week total: 31.5 (257.0 + 31.5) / 13 = 22.19 # 14. Mon 29th of August 2005 29.08.2005 MEET 1.0 Meeting with the project group 29.08.2005 OTPR 2.0 Wrote some of the implementation document 30.08.2005 OTPR 2.0 Wrote some of the impl doc 30.08.2005 OTPR 1.0 Reading impl., conc., test. docs for review 31.08.2005 MEET 1.5 Meeting and review of the docs 31.08.2005 OTPR 1.5 Correcting the documents # 14. week total: 9.0 (288.5 + 9.0) / 14 = 21.25