Joonas Kukkonen #PVM LUOKKA TUNNIT KUVAUS 17.5.2005 MEET 1.0 Group meeting 17.5.2005 INST 2.0 Fortran, CVS, Latex, plus other documents 18.5.2005 INST 2.0 Studying Fortran 19.5.2005 MEET 1.0 Planning a meeting 19.5.2005 MEET 2.0 Group meeting 19.5.2005 INST 1.0 Installing CVS 20.5.2005 MEET 1.0 Planning a meeting 20.5.2005 MEET 2.5 Meeting with the client 22.5.2005 OTHE 2.0 Learning to use LaTeX 22.5.2005 PROJ 1.5 Writing Project Plan #week 2 23.5.2005 MEET 2.0 Project leader meeting 23.5.2005 MEET 2.0 Group meeting 23.5.2005 OTHE 1.0 Writing week report, planning next meeting 24.5.2005 MEET 2.0 Meeting with the client 24.5.2005 PROJ 2.0 Writing introduction and helping with risks 25.5.2005 MEET 2.0 Group meeting 25.5.2005 PROJ 1.0 Risk analysis 26.5.2005 KNOW 1.0 Reading IEEE SRS 26.5.2005 MEET 1.0 Planning next meeting 27.5.2005 MEET 2.0 Group meeting 27.5.2005 PROJ 1.0 Reviewing the project plan #week 3 30.5.2005 MEET 1.0 Planning the meeting 30.5.2005 MEET 2.0 Meeting with the client 30.5.2005 OTHE 1.0 Email, Fortran NAG libraries, etc 31.5.2005 REQU 3.0 Requirements analysis 1.6.2005 MEET 0.5 Planning the meeting 1.6.2005 MEET 2.0 Group meeting 1.6.2005 REQU 1.0 Reviewing requirements, drawing ER model 2.6.2005 MEET 0.5 Planning the meeting 2.6.2005 MEET 2.0 Meeting with the client 2.6.2005 INST 1.0 Studying Fortran 5.6.2005 OTHE 1.0 Email, reading SRS, planning next meeting #week 4 6.6.2005 MEET 2.0 Meeting with the client 6.6.2005 OTHE 1.0 Weekly report, studying fortran 7.6.2005 MEET 0.5 Planning the meeting 7.6.2005 MEET 2.0 Group meeting 8.6.2005 MEET 0.5 Planning the meeting 8.6.2005 MEET 2.0 Group meeting 9.6.2005 REQU 2.0 Drawing models, writing SRS 9.6.2005 MEET 0.5 Planning the meeting 9.6.2005 MEET 2.0 Meeting with the client 10.6.2005 REQU 2.0 Writing and reading SRS 10.6.2005 MEET 0.5 Planning the meeting 10.6.2005 MEET 2.0 Group meeting # week 5 13.6.2005 MEET 0.5 Planning the meeting 13.6.2005 MEET 2.0 Group meeting 13.6.2005 OTHE 0.5 Weekly report, metric system and hours 14.6.2005 MEET 0.5 Planning the meeting 14.6.2005 MEET 2.0 Group meeting 14.6.2005 DESI 0.5 Planning the modelling language 15.6.2005 MEET 0.5 Planning the meeting 15.6.2005 MEET 1.0 Group meeting 15.6.2005 DESI 1.0 Planning the modeling language with Anni 16.6.2005 DESI 0.5 Reading planed simtech input formats and modeling languge 16.6.2005 REQU 1.0 Reading the SRS 16.6.2005 INST 1.0 Studying Fortran 17.6.2005 MEET 1.0 Planning the meeting 17.6.2005 MEET 2.0 Review (SRS) 19.6.2005 REQU 1.0 Writing SRS 19.6.2005 DESI 1.0 Planning the system # 16 hours # week 6 20.6.2005 MEET 0.5 Planning the meeting 20.6.2005 MEET 2.0 Meeting with the project group 20.6.2005 OTHE 0.5 Writing weekly report, etc 21.6.2005 DESI 2.0 Designing data structures 22.6.2005 MEET 0.5 Planning the meeting 22.6.2005 MEET 2.0 Meeting with the project group 22.6.2005 DESI 1.0 Designing data structures 23.6.2005 INST 1.0 Studying Fortran 26.6.2005 DESI 3.0 Designing the generator, drawing models 26.6.2005 OTHE 1.0 Reviewing risks, requirements and reading documets # 13.5 hours #week 7 27.6.2005 MEET 0.5 Planning the meeting 27.6.2005 MEET 2.0 Meeting with the project group 27.6.2005 MEET 1.0 Meeting with Marko Salmenkivi 27.6.2005 OTHE 0.5 Writing weekly report, etc 28.6.2005 DESI 3.0 Designing datastructures and drawing models 29.6.2005 MEET 0.5 Planning the meeting 29.6.2005 MEET 2.0 Meeting with the project group 29.6.2005 DESI 1.0 Designing datastructures and drawing models 30.6.2005 DESI 1.0 Reading design document 30.6.2005 DESI 2.0 Designing generator 1.7.2005 MEET 0.5 Planning the meeting 1.7.2005 MEET 2.0 Meeting with the project group 1.7.2005 DESI 1.0 Designing generator # 17.0 this week #week 8 18.7.2005 MEET 0.5 Planning the meeting 18.7.2005 MEET 2.0 Meeting with the project group 18.7.2005 OTHE 0.5 Writing weekly report, etc 19.07.2005 DESI 2.0 Designing with the group 19.07.2005 DESI 1.0 Designing at home 20.07.2005 DESI 2.5 Meeting with the project group (designing) 20.07.2005 DESI 1.0 Designing the data structures and drawing models 21.07.2005 DESI 3.5 Designing and writing the document 21.07.2005 DESI 0.5 Reading the document 22.07.2005 MEET 2.0 Meeting with the project group 22.07.2005 DESI 1.5 Writing the document, drawing models 24.07.2005 DESI 2.0 Writing the document # 19.5 this week # week 9 25.7.2005 MEET 0.5 Planning the meeting 25.7.2005 MEET 1.0 Meeting with the project group 25.7.2005 DESI 2.0 Writing the design document 25.7.2005 OTHE 0.5 Weekly report, etc 26.7.2005 TEST 0.5 Discussing testing. 26.7.2005 DESI 1.0 Discussing design and reading, writing the design document. 26.7.2005 IMPL 1.5 Coding datastructures 25.7.2005 TEST 1.0 Reading the desing document 27.7.2005 MEET 1.0 Meeting with the project group 27.7.2005 DESI 1.0 Correcting error in Design document 27.7.2005 IMPL 2.0 Coding datastructures 28.7.2005 IMPL 2.0 Coding datastructures 28.7.2005 TEST 1.0 Testing DistributionFactory / UserDefinedDistribution 28.7.2005 DESI 0.5 Correcting errors in design document 29.7.2005 MEET 1.0 Meeting with the project group 29.7.2005 IMPL 2.0 Coding datastructures, correcting errors 30.7.2005 IMPL 1.0 Testing classes, correcting errors 30.7.2005 OTHE 1.0 Writing manual and implementation document templates 31.7.2005 IMPL 1.0 Viewing work of others 31.7.2005 DESI 1.0 Reading the design document 31.7.2005 MEET 0.5 Planning Monday's meeting # 23.0 this week # week 10 01.08.2005 MEET 0.5 Planning the meeting 01.08.2005 MEET 2.0 Meeting with the project group 01.08.2005 OTHE 0.5 Weekly report, etc 01.08.2005 IMPL 1.0 Studying the work of others 02.08.2005 DESI 2.0 Reading the design document and planning the FTR 02.08.2005 IMPL 1.0 Coding datastructures 03.08.2005 MEET 1.0 Design document FTR 03.08.2005 IMPL 2.0 Coding Generator class and correcting errors 03.08.2005 IMPL 1.0 Discussing implementation 04.08.2005 IMPL 3.0 Coding Generator class 05.08.2005 MEET 1.5 Meeting with the project group 05.08.2005 IMPL 1.5 Discussing implementation, coding Generator 07.08.2005 OTHE 1.0 Planning next meeting, reading code, etc # 18.0 this week #week 11 08.08.2005 MEET 1.5 Meeting with the project group 08.08.2005 IMPL 2.0 Coding FortranMain, splitting up classes 08.08.2005 OTHE 0.5 Reviewing timetable, writing weekly report, etc 09.08.2005 MEET 1.0 Meeting with the customer 09.08.2005 IMPL 1.0 Coding FortranMain and reviewing Acceptation 10.08.2005 IMPL 1.0 Coding FortranMain, writing a model 10.08.2005 IMPL 1.0 Trying to get the program to run 10.08.2005 OTHE 2.0 Taina's testing lecture 11.08.2005 MEET 2.0 Meeting with the project group 11.08.2005 OTHE 2.0 Drawing a diagram from the system, reviewing the timetable 14.08.2005 OTHE 1.0 Making a timetable, reviewing things to do 14.08.2005 OTHE 1.0 Discussing timetable and implementation # 16.0 this week #week12 15.08.2005 MEET 3.0 Official meeting 16.08.2005 TEST 2.5 Meeting, writing tests for distribution classes 16.08.2005 TEST 1.0 Testing at home 17.08.2005 TEST 2.0 Testing and documenting 17.08.2005 TEST 0.5 Documenting at home 17.08.2005 OTPR 0.5 Planning the user manual 18.08.2005 OTPR 4.0 Writing the user manual 18.08.2005 TEST 2.0 Official meeting, hunting bugs 19.08.2005 OTPR 2.0 Writing the user manual 21.08.2005 OTPR 2.0 Writing the user manual # 19.5 this week #week13 22.08.2005 OTPR 2.0 Reading and writing the user maual 22.08.2005 MEET 0.5 Planning the weekly meetings 23.08.2005 MEET 3.0 Meeting with the project group 24.08.2005 MEET 3.0 Meeting with the project group 25.08.2005 IMPL 3.0 Writing the implementation document 26.08.2005 MEET 1.0 Meeting with the project group 26.08.2005 IMPL 2.5 Writing implementation and testing documents 28.08.2005 IMPL 2.0 Writing implementation document 28.08.2005 OTHE 1.0 Reading the documents, planning the last week # 18.0 this week #week14 29.8.2005 MEET 1.0 Meeting with the project group 29.8.2005 IMPL 1.5 Writing the implementation document 29.8.2005 TEST 0.5 Writing the testing document 30.8.2005 IMPL 1.0 Finalizing the implementation document 30.8.2005 OTPR 1.0 Writing the end document 30.8.2005 IMPL 1.0 Reading implementation, testing and end document 31.8.2005 OTPR 2.0 Finalizing documents 1.9.2005 OTHE 1.5 Metrics system 1.9.2005 OTPR 0.5 Adding working hours to the conclusion document 1.9.2005 OTHE 1.0 Finalizing the product # 11 hours this week, note that I had a flu