30.4.2001

Pöytäkirja
30.4.2001, 10-12h
Present: Osku, Perttu, Peter, Petteri, Philipp, Toni

1) Testing Documentation
The module-testing is now almost finished, 
Philipp takes care of the validation-testcase-descriptions
and the finalizing.

2) User Manual
Osku finalizes this paper.

3) Final Report
Philipp makes a sceletton.
Toni integrates the minutes in the paper.

4) Maintenance Document 
Petteri finalizes this paper.

For the to-do list:
- use of MPI-multicast, when there is a better version available.
- "better" correlation calculation
- tools, which would be nice to have ...

A list of tools we have, how they are called and basically what they
are for.

Where is which data and configgurations