9.4.2001

Pöytäkirja
9.4.2001, 10-12h
Present: Osku, Perttu, Peter, Petteri, Philipp
Excused absence: Toni

1) Testing

The testing is not yet finished, some specifications of testcases and
their implementation is still missing.

2) Documentations

There exist now first versions of the user manual and the maintenance
documentation. All still not finished documentations we have to create
are:
- Testing Plan/Testing Report
- User Manual
- Maintenance Documentation
- Final Report
- Modification Documentation
(- Listing of the source-code)

The changes of the distribution design have to be added to the
modification doc.