14.2.2001

Pöytäkirja
14.2.2001, 12-14h
Present: Osku, Perttu, Peter, Petteri, Philipp, Toni

1) Requirement-Specification-Paper

After the formal review was canceled, we did a thoroughly review anyways.
The data-flow and the control-flow images will be updated by Toni, all
the other changes will be done by Petteri.