31.1.2001

Pöytäkirja
31.1.2001, 12-14h
Present: Osku, Perttu, Peter, Petteri, Philipp, Toni

1) Projectplan

The projectplan is now finished. The schedule could be more detailed, 
we have to update it eventually. Everybody reads the pp.

2) Language of documentation

Except the projectplan, which is now in finnish, all further documents will
be written in english language.

3) Requirement-Specification-Paper

A first raw version of the Software-Requirements-Specification has been 
prepared by Toni. Some detailed work is still to do:

Chapter 2: Something about Parallel computing. Toni

Chapter 3: Toni

Chapter 4: A Graph of the "big picture", where our project fits in. Toni

Chapter 5: 5.1 checking out something about the 3D-model and the micrograph. Pertu
           5.2 A raw data-flow and control-flow diagram considering the facts 
           we allready now. Toni

Chapter 6: 6.1-6.3 postponed, allready kind of design-work 
           6.4 & 6.5 Petteri

Chapter 7: Philipp

Chapter 8: Some performance-calculations, usability (number of involved nodes etc.)           
           user-made errors, programming-style-paper. Osku

Chapter 9: bottom-up module-testing, testpictures etc. Philipp

Chapter 10: 10.3 Some guesses. Osku

The tasks described above should be finished until next week wednesday 7.2.

4) Distribution
Next aim is to get a test-program, which transfers lot of data between nodes.

5) Miscellaneous
Peter gets us somehow a mailinglist.
Osku is now responsible to make each week a backup of the cvs-folder etc.

Next meeting is monday, 5.2.